RADX CONSTRUCTION BEGINS MAJOR PARKADE PROJECT TO BOOST DESIGN QUARTER ACCESSIBILITY

The Design Quarter in Harare has quickly established itself as a premier destination for lifestyle, art, and high-end retail. Located directly adjacent to the bustling Highland Park Mall, this precinct serves as a sophisticated extension of the city’s most popular shopping corridor.

As the area continues to attract a growing number of visitors and premium tenants, the demand for seamless access has become a top priority. To meet this need, RadX Construction has officially commenced work on a massive five-storey parkade that will serve as the backbone of the precinct’s infrastructure.

For a premium shopping destination, the visitor experience begins long before they walk into a store; it starts with the ease of parking. The new structure adds five levels of dedicated parking space, ensuring that the Highland Park and Design Quarter ecosystem can handle high traffic volumes while maintaining the sense of luxury and convenience that shoppers expect. The project is not just about adding space, but about supporting the long-term growth of one of Zimbabwe’s most prestigious commercial hubs.

When the Structure & Design Magazine team visited the site at the end of April, the construction site was a hive of activity, focused on the critical foundational and groundworks phase. The team captured images of the site showing that extensive excavation has been completed to prepare the earth for the immense weight of a multi-level concrete building.

Because a five-storey parkade must support hundreds of vehicles simultaneously, the load-bearing requirements are extremely high. Large-scale trenches and footings are now visible across the site, forming the deep “roots” of the building. Steel reinforcement bars, known as rebar, are prominent throughout the area, protruding from the excavated ground like a metallic forest. these bars will soon be encased in concrete to form the skeletons of the massive columns that will support the upper decks.

As the project moves upward from the ground, the structural framework is beginning to take shape. The transition from underground work to vertical construction is marked by the rising of reinforced concrete columns.

In several sections of the site, square and rectangular formwork—the temporary “moulds” used to hold wet concrete—is visible. Much of this concrete has been recently poured and is currently in the curing process. These vertical elements are being strategically placed according to a precise structural grid. This alignment is vital, as it ensures that the weight of the five floors is distributed evenly, maximizing the building’s footprint in the narrow space available next to the existing mall.

The site itself is a model of modern engineering logistics. As an active construction zone, it is characterized by the constant movement of specialized machinery. Excavators and heavy earth-moving equipment are positioned around the perimeter, levelling the remaining soil and clearing the way for the next phase of the slab pour.

Despite the intensity of the work, the site remains highly organized. Material staging areas are clearly defined, holding neat bundles of rebar and timber for formwork. The construction zone is strictly demarcated from the finished, operational sections of the Design Quarter, ensuring that the focus remains entirely on the structural integrity of the base levels without disrupting nearby businesses.

Finally, the layout of the site reveals the carefully planned flow of the future parkade. Wide spans between the emerging columns indicate where vehicles will move and park, ensuring the structure is user-friendly and safe. Behind the scenes, drainage systems and underground utility conduits are already being integrated into the foundational layers.

The early integration is essential before the primary ground slab is completed. Building a high-capacity, heavy-duty structure in such a confined space next to a high-traffic hub is a complex technical challenge, but the progress made by RadX Construction suggests a solid foundation for the Design Quarter’s future.

 